Residential • Commercial • Installation • Dry Hire

STEP BY STEP H FRAME SET UP

<< Prev  |  Play  |  Next >>
Showing image 1 of 9

Step One - This building is 3.5m High to spouting, this is a 1 lift Frame. If the spouting 4m height will need another 1/2 frame to reach it comfortably on semi falt ground.













© Cougar Scaffolding Ltd - 14 Jupiter Grove, Upper Hutt, Wellington - e. info@cougarscaffolding.co.nz